Roland LEC-540 Guia de Configuração Página 58

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 64
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 57
56
8. Installation of Ventilating Equipment
Ventilating Equipment
In preparing ventilating devices, please note the following points.
You will be required to use the ventilating devices recommended by Roland DG Corporation. For the details
of the recommended products, contact your authorized Roland DG Corp. dealer.
You will need a hose to connect the ventilating equipment and this machine.
The connecting port diameter: 38mm
P. 19, “Air Ventilation”
Installing the Ventilating Equipment
Note: The 3-mm hexagonal wrench is not included. It must be provided separately.
Procedure
Remove the board on the right side of the
air intake box.
Attach the connection adapter.
Use the screw securing the board on the right side
of the air intake box.
Hexagonal
wrench (3 mm)
Vista de página 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 64

Comentários a estes Manuais

Sem comentários