Pre-installation Checklist.
The following is a checklist that should be followed to ensure that the Heater Upgrade
goes without any issues. Failure to follow this process could result in longer install time
and possible damage to the unit and or self.
1.
Run print tests prior to installing the heater kit to ensure that all nozzles are firing and that the unit is
functioning up to factory specifications. If the machine has any hardware issues, do not install the
heater upgrade until the machine is back to factory specifications.
2. Using the included Cleaning Cartridges, perform head wash to evacuate and clean the SOL Inks
from the system to prepare it for the ECO-SOL Inks (Refer to PRO II Service Notes for details).
3. Perform the Heater Upgrade using the provided instructions.
4. Update the Firmware and System Switch Setting using the provided instructions.
5. Perform Ink Conversion and adjustments.
6. Configure the Heater Controller.
7. *Replace the Pump Assemblies, Wiper Blades and perform associated adjustments (refer to the
PRO II Service Notes for installation and adjustment procedures).
* Check Pump Hours, If under 100 Hours, there is no need to replace them.