Roland SJ-740 Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Digitalizar e Imprimir Roland SJ-740. Heater Install Instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 53
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Roland Service Bulletin
09/15/03 Page 1 of 53
Roland DGA Corporation
15363 Barranca Parkway
Irvine, CA 92618
Tel: 800/542-2307
Fax: 949/727-2112
www.rolanddga.com
Roland DGA Service Bulletin
MODEL: SC-540, SJ-540, SJ-740 BULLETIN DATE: 9/11/2003
BULLETIN NUMBER: HU-0003 AUTHOR: Rick Rivera
SUBJECT: Heater Installation Procedures for SOLJET Printers (PRO II) REVISION: Initial Release
Overview:
The following information gives instructional information for the HU-540/740 Heater Unit Kit for the Roland
PRO II SOLJET Printers (SC-540, SJ-540 and SJ-740). Please read the following information prior to doing
any work on the machine to ensure that the upgrade is performed smoothly and by specification. Failure to
do so may result in delays in the installation process or possible damage to machine components or to self.
If further assistance is needed, please contact Technical Support or Service at (800) 542-2307.
Vista de página 0
1 2 3 4 5 6 ... 52 53

Resumo do Conteúdo

Página 1 - Roland DGA Service Bulletin

Roland Service Bulletin 09/15/03 Page 1 of 53 Roland DGA Corporation 15363 Barranca Parkway Irvine, CA 92618 Tel: 800/542-2307

Página 2 - SC-540, SJ-540

Installing the Heater Bed, cont.6. Remove the 5 screws connected to the Bed F and install 4 Spring Bed Assy and 1 Stay, Spring.(NOTE: When removing th

Página 3 - HU-540/740 Kit Components

Installing the Heater Bed, cont.7. Install the Clamp, Base and Insulock Tie to the Spring Bed Assy as shown in Fig. 8 & Fig. 9Fig. 9Fig. 8

Página 4

Installing the Heater Bed, cont.8. In order to mount the Thermostat properly, mount it at the 2ndscrew position from the right side using double sided

Página 5 - Pre-installation Checklist

Installing the Heater Platen10. Place the Heater Platen onto the bed of the unit and align the cables from the Thermistor and Thermostat as shown the

Página 6 - Installing the Heater Bed

Installing the Heater Platen, cont.11. Tighten the cable from the Heater Bed at the left side of the machine with the Insulock Tie. Then tighten the c

Página 7 - Fig. 2 Fig. 3

Installing the Heater Platen, cont.12. Tighten the 3 cables at the Stay, Spring for the HU-540 (5 cables for the HU-740) as shown in Fig. 5 and Fig. 6

Página 8

Installing the Heater Platen, cont.14. Install the new Shutter, Platen (not necessary to install with double sided tape) as shown on Fig. 8. Also, tra

Página 9

Installing the Heater Platen, cont.15. If you install the HU-740 on the Roland SJ-740, you have to change the position of the Stopper for the Media Cl

Página 10 - Stay, Spring

Installing the Heater Platen, cont.17. Tighten the Heater cables with the Insulock Ties and run the Heater cables through to the back of the machine a

Página 11 - & Fig. 9

Installing the Heater Controller1. Take the Connection cable and connect to CN9 located on the Servo Board. Next, route the cable through the clamps a

Página 12 - Fig. 10 Fig. 11

Rick RiveraService Training TechnicianHeater Unit Installation Procedures for Roland SC-540, SJ-540and SJ-740 SOLJET PrintersBeforeAfter

Página 13 - Installing the Heater Platen

Installing the Heater Controller, cont.2. Install the Chassis Cover and Top R Cover (Fig. 4).Fig. 43. Mount the front side of the Heater Controller to

Página 14 - Fig. 3 Fig. 4

Installing the Heater Controller, cont.4. Remove the 2 screws located at the bottom of the Chassis Cover (Fig. 7).5. Place the Heater cables through t

Página 15

Installing the Heater Controller, cont.6. Mount the Plate, Duct Stay 1 to the right and the Plate, Duct Stay 2 to the left as shown in Fig. 9. Fig. 9

Página 16

Installing the Heater Controller, cont.7. Loosen the screw connecting the Tube Holder and take it off along with the Hex screw from the Plate, Duct St

Página 17

Installing the Heater Controller, cont.9. Mount the Tube Holder back to the original location and connect the cables from the Heater Controller and th

Página 18 - Fig. 12 Fig. 13

Installing the Heater Controller, cont.10. Attach the Cover, Duct Stay 1 with the Cup Screws 3x6 as shown in Fig. 14.Fig. 13

Página 19 - Fig. 1 Fig. 2

Head Height Adjustment1. Enter Service Mode by turning on Sub-Power while pressing [◄], [▼] and [►]. Once in Service Mode, navigate to the [CAP&WI

Página 20 - Fig. 5 Fig. 6

Head Height Adjustment2. Raise the Head Height Lever (Fig. 3) and Manually move the Carriage to the Head Height Adjustment position (Fig. 4). Fig. 3Fi

Página 21

Head Height Adjustment3. Place the Adjustment Plate which came with the HU-540/740 Heater Kit under the Head Carriage ensuring that you do not strike

Página 22

Head Height Adjustment5. Check the gap between the Head and the Plate (Fig. 7). If it is uneven, carryout the Head Height Adjustment procedure once ag

Página 23

HU-540/740 Kit Components

Página 24

Firmware Update and System Switch Change1. Connect the Windows based PC to the SC-540, SJ-540 or SJ-740 via Parallel Cable. Ensure that you have the f

Página 25

Firmware Update and System Switch Change3. From the DOS Prompt, navigate to the directory to where the Firmware is located and run the DOWNLOAD.BAT fi

Página 26 - Head Height Adjustment

Firmware Update and System Switch Change4. Enter Service Mode by pressing the [◄], [▼] and [►] keys while turning on Sub-Power.Fig. 3

Página 27

Firmware Update and System Switch Change4. Scroll to the [System Switch] menu and using the [►] key, navigate to [Page3]. Convert Bit1 from 0 to 1 and

Página 28

Ink Conversion and Adjustments1. Enter Service Mode by pressing the [◄], [▼] and [►] keys while turning on Sub-Power (Fig. 1). Select the [Sleep] menu

Página 29

Ink Conversion and Adjustments3. Enter the [Ink Control] menu and select [Change Ink Set] and select [Eco-SOL LcLm]. Then, follow the messages display

Página 30

Ink Conversion and Adjustments4. Enter the [Head Adjust] menu and select [Test Print] from the [Bias], [Vertical]and [Horizontal] for confirmation. Al

Página 31

Configuration of the Heater Controller, KeyLock Release.1.Press and hold the [SEL] key until the the display shows the following (Fig. 1). NOTE: The “

Página 32

Configuration of the Heater Controller, KeyLock Release.3. Press the [SEL] key and the value will start to blink as shown (Fig. 3).Fig. 34. Press [▼]

Página 33

Configuration of the Heater Controller, KeyLock Release.5. Press the [SEL] key to save the parameter (Fig. 5).Fig. 56. Press and hold the [SEL] key to

Página 34

HU-540/740 Kit Components, cont.SOL Pump Assemblies x3 w/ Pump Plates Installed.Wiper Blades x 2SOL Cleaning Cartridges x4ECO Ink, Starter Set - 2 pe

Página 35

Configuration of the Heater Controller, Changing the P.I.D. Parameters1. Press and hold the [SEL] key to enter the parameter change mode (Fig. 1).Fig.

Página 36 - [Bi-Dir. Default] menu

Configuration of the Heater Controller, Changing the P.I.D. Parameters3. Using the [▼] or [▲]key to change the parameter to 3.0 (Fig. 3)Fig. 34. Press

Página 37 - Lock Release

Configuration of the Heater Controller, Changing the P.I.D. Parameters5. Press the [▼] key to move to the next menu item (Fig. 5). Fig. 56. Press the

Página 38

Configuration of the Heater Controller, Changing the P.I.D. Parameters7. Press the [▼] or [▼] key to change the value to 100 (Fig. 7). Fig. 78. Press

Página 39

Configuration of the Heater Controller, Changing the P.I.D. Parameters9. Press the [▼] key to select the following parameter (Fig. 9). Fig. 910. Press

Página 40

Configuration of the Heater Controller, Changing the P.I.D. Parameters11. Press the [▼] or [▲] key to change the parameter to 20.0 (Fig. 11). Fig. 111

Página 41

Changing the Control System1. Press the [▼] four times till the following display is shown (Fig. 1). Fig. 12. Press the [SEL] key so the value blinks

Página 42

Changing the Control System3. Press the [▼] change the value to the following (Fig. 3). Fig. 34. Press the [SEL] key to save the parameter (Fig. 4).Fi

Página 43

Changing the Control System5. Press and hold the [SEL] key until the Normal Menu is displayed (Fig. 5). Fig. 5

Página 44

Key Lock Setting1. Press and hold the [SEL] key until the following menu is displayed (Fig. 1). Fig. 12. Press the [▼] key until the following menu is

Página 45

Pre-installation Checklist.The following is a checklist that should be followed to ensure that the Heater Upgrade goes without any issues. Failure to

Página 46 - Changing the Control System

Key Lock Setting3. Press the [SEL] to the value blinks (Fig. 3). Fig. 34. Press the [▲] key to change the parameter to 2 (Fig. 4). Fig. 4

Página 47

Key Lock Setting5. Press the [SEL] to save the parameter (Fig. 5). Fig. 56. Press and hold the [SEL] key until the Normal Display shows indicating tha

Página 48

Additional Upgrade Items:Once the Heater Upgrade is completed and the machine has been tested, please inspect and replace the *Pump Assemblies and Wip

Página 49 - Key Lock Setting

Thank you on behalf of Roland University

Página 50

Installing the Heater Bed1.Confirm that the voltages which are printed on the backside of the Heater Controller, printed on the Heater Platen cable an

Página 51

Installing the Heater Bed, cont.Fig. 2 Fig. 32. Turn off the Primary Power Switch from the back of the unit and remove the following covers as shown i

Página 52 - Additional Upgrade Items:

Installing the Heater Bed, cont.3. Remove all of the Platen Plates, Media Clamp Stopper and Media Clamps as shown in Fig. 4. Note: for the SC-540, als

Página 53 - Thank you on behalf

Installing the Heater Bed, cont.5. Clean the bed of the unit using a cloth and alcohol and then install the Bed Heater to the bed of the unit. When in

Comentários a estes Manuais

Sem comentários